PRE-COMMISSION CLEANING & FLUSHING

The condition of a water system at the point of commissioning determines how it performs for the rest of its operational life. Construction debris, mill scale, flux residues, oils and corrosion products left in pipework and equipment cause premature failures, reduced efficiency and increased maintenance costs from day one.

Pre-commission cleaning is a mandatory requirement for all new heating and chilled closed-loop water systems, and for systems that have undergone major extensions or alterations. ClearFlow Water Limited provides BG29 compliant pre-commission cleaning and flushing services for M&E contractors and building services engineers across Kent, South East London and Essex.

What Is Pre-Commission Cleaning?

Pre-commission cleaning is the process of removing contamination introduced during the construction or installation of a water system before it is handed over and put into service. It is a requirement under BSRIA BG29, the industry's primary guidance document for the commissioning of heating and chilled water systems.

A system that is not properly cleaned before commissioning will carry that contamination into service, where it accelerates corrosion, fouls heat exchangers, blocks strainers and damages pump seals. Getting it right at this stage protects the entire system going forward.

Our Pre-Commission Cleaning Process

ClearFlow follows a structured cleaning process in accordance with BG29 best practice guidance.

Stage 1 - Conventional Raw Water Flush

The system is initially flushed with raw water to remove loose installation debris, sediment, magnetite and suspended solids. This clears the system of bulk contamination and prepares it for effective chemical cleaning.

Stage 2 - Chemical Cleaning

Specialist cleaning chemicals are circulated through the system to remove mill scale, flux residues, oils, greases and corrosion products that a water flush alone cannot shift. Water quality is continuously monitored throughout this stage until the required cleanliness standard is confirmed.

Stage 3 - Final Flush and System Protection

Following successful chemical cleaning, the system is flushed to remove cleaning chemical residues. Where the specification includes demineralised balanced flushing, this is carried out at this stage to achieve low-hardness, low-conductivity system water. The system is then dosed with corrosion inhibitor and, where required, biocide, and tested to confirm operating parameters before handover.

WHY CHOOSE US

Trusted & Reliable

Experienced Flushing Engineers

All pre-commission cleaning and flushing is carried out by experienced engineers with a track record across commercial, residential and industrial new build and refurbishment projects.

BG29 Compliant at Handover

All works are completed in accordance with BSRIA BG29, with full water quality test results provided as part of your project handover documentation.

Kent and London Based

We are based in Sevenoaks and cover Kent, South East London and Essex, with fast response times and strong local knowledge.

Experienced on Live Construction Sites

We are used to working to programme alongside other trades on active sites. Our engineers coordinate with your project team to ensure cleaning is completed at the right stage of the build.

Any System, Any Size

From small commercial installations to large multi-zone systems, we have the chemicals, equipment and experience to clean and flush pipework of all configurations and complexities.

bottom of page